How to Install a CLY Chain Link Fence: Step-by-Step Guide for Contractors
Install a CommandFence CLY fence by setting out the perimeter, establishing terminal and line posts, assembling crossbars, tensioning the mesh, securing the specified connections, and checking gate operation. Use approved project drawings for foundations and installation details. Give the crew the matching component schedule, connection details and inspection requirements before work starts.
Components and preparation
Check deliveries against the purchase order and separate materials by fence run. Record shortages before mobilising installers; distributors should resolve substitutions with CommandFence before dispatch.
The CLY component schedule includes:
- Posts: steel end posts, Ø70/Ø100 mm, and central posts, Ø56/Ø60 mm; hot-dip galvanised with polyester powder coating.
- Crossbars/top rail: reinforced crossbars and specialised post connectors. Match each connector to the ordered assembly.
- Mesh: woven steel wire with galvanising and PVC coating; standard wire diameter 4 mm.
- Connections: Ø2.0 mm stainless binding wire secures tensioned wire to posts; dedicated stainless buckles connect mesh and tensioned wire.
- Colour: RAL 6005 is listed for mesh and posts; PVC coating is available in any colour.
Use the CLY component specification alongside the project drawings when checking the delivery.
Prepare measuring and alignment equipment, excavation equipment, levelling tools, cutters, and a suitable mesh puller. Keep supplied fittings identifiable through storage and installation. Photograph damaged coatings on receipt, quarantine affected components, and agree their disposition before incorporating them into the fence.
CLY is made to order in any height. We supply both embedded-in-concrete posts and base-plate (bolt-down) posts. The choice depends on site conditions. Identify the selected mounting method in the project drawings. The excavation and concrete-setting steps below apply to embedded posts; for base-plate posts, use the approved base-plate and anchoring details.
Step-by-step installation
1. Lay out the fence and openings
Mark the perimeter with stakes and a taut string. Identify corners, ends, and gate openings before allocating intermediate posts.
Walk the route with the current drawing. Resolve discrepancies between the surveyed alignment and site conditions before excavation. Include access for delivering mesh and removing spoil in the work sequence. Record any proposed route change so the distributor can check its effect on the component schedule.
Set out post centres from the project layout. Send us the site plan, fence height and openings so the panel and post schedule can be prepared for each run.
2. Excavate post holes and establish footings
Give the foundation designer the ground conditions and proposed fence layout. Include footing depth, diameter, concrete specification and reinforcement in the installation drawings. Put the curing and loading-release requirements in the work sequence so the crew can plan when to start tensioning.
Excavate and construct the footings to the project foundation detail. Keep an excavation record and refer unexpected ground conditions to the responsible designer. Arrange inspection before concealing work. The installation supervisor should know who can release the foundations for subsequent loading and what evidence that decision requires.
3. Set terminal posts, then line posts
Locate terminal posts at ends, corners, and gate positions; align intermediate line posts to the string and check plumb with a level.
Keep post types labelled until installed. Allocate each diameter to its scheduled position at corners, ends, openings or intermediate locations. Cross-check each location against the approved schedule before placing concrete. Recheck the alignment during setting and record deviations for correction before the mesh crew starts.
Check corner and gate-post selection, bracing, embedment and finished elevations against the drawings. Record these checks with the setting-out inspection.
4. Fit crossbars and connectors
Measure the required spans and assemble the horizontal supports. Check component identification against the supplied connection detail before cutting or tightening anything.
Set crossbars at the drawing elevations and orient the connectors to the connection detail. Apply the specified tightening method and use the agreed procedures for cutting and coating repair.
Use the initial assembly as a workmanship reference after its details are accepted. Keep installation photographs available to subsequent crews so changes of shift do not introduce inconsistent connections. Send the supplier the component identification and connection location to resolve a mismatched connector.
5. Position and tension the mesh
Unroll the mesh along the run, secure its starting end, and use a puller to remove slack before final fixing.
Plan handling so the roll can move along the work area without being dragged across sharp edges. Keep tools and temporary pulling equipment organised outside the access route. Stop if the mesh distorts, a connection moves, or a post changes alignment; identify the cause before continuing.
Follow the project details for terminal anchorage, pulling method, tension, tension-wire arrangement and ground clearance. Recheck alignment as tension is applied and before completing the fixings.
6. Fix the mesh and inspect connections
Use the CLY connection arrangement listed above. Check each completed run against the accepted assembly before moving materials to the next location.
Apply the binding-wire wrap and buckle spacing shown on the connection detail. Check the specified mesh-to-post and crossbar fixings as part of the same run inspection.
Record missing or damaged fittings on a snag list with clear locations. Close those items before presenting the run for acceptance. Replenish installation materials from the scheduled fitting list to keep connections consistent throughout the fence.
7. Install gates and complete handover
Fit the specified hinges and latch; verify free movement and secure closure. Follow the gate manufacturer's installation instructions.
Check gate foundations, hardware and clearances against the gate drawings. Complete the specified commissioning checks before demonstrating operation.
Demonstrate operation to the receiving party and record outstanding adjustments. Handover should include the final layout, approved changes, inspection records, and relevant product information. Remove offcuts and temporary equipment after the completed work has been checked.
Installation checks to build into the work plan
| Stage | Check | Record |
|---|---|---|
| Setting out | Alignment, post locations and openings | Layout and approved changes |
| Foundations | Dimensions and release for loading | Inspection and release decision |
| Assembly | Scheduled posts, crossbars and fittings | Component and connection checks |
| Mesh fixing | Alignment, connections and coating condition | Completed-run inspection |
| Gates | Free movement and secure closure | Operating demonstration and adjustments |
Keep the current drawing revision with the crew. Carry fitting identification through from delivery to installation, and document coating repairs alongside the assembly inspections.
FAQ
Can distributors specify CLY from a generic chain link parts list?
Use a project-specific schedule. Reconcile the ordered components with the drawings, including corners, changes of direction, and openings, before confirming the shipment.
How should the contractor select footing dimensions?
Use the foundation designer's project details. Provide the ground conditions and fence layout, then include the footing dimensions, concrete specification, reinforcement and loading-release criteria in the crew's work plan.
Can CLY follow sloping ground?
Yes. CLY accommodates slopes and different angles. Send us the site levels and fence layout so the slope assembly and transitions can be detailed on the project drawing.
What should the contractor request before starting?
Request approved drawings, a reconciled component schedule, connection details, foundation release requirements, and gate instructions. Identify the supplier and designer contacts in the work plan so the crew can direct site queries promptly.
Lead time, MOQ and samples
Within 3 working days of your order, we confirm the contract, sizes and specifications with you. Production then takes about 20–30 days for a standard order; if a project needs longer, we tell you in advance. Ocean transit depends on the destination. Our minimum order quantity is 500 m, and trial orders are welcome. Samples are charged; the sample cost is credited against your order.
Send your site layout, fence height and quantity to get a quotation. We can courier samples first; the sample cost is credited against your order.